-
Home
-
Attachments
Demolition EquipmentMulti-ProcessorPowerful ShearEagle Shear-HardoxRail ShearPowerful CrusherMulti CrusherConcrete CrusherHydraulic PulverizerMagnet Type PulverizerSingel Cylinder CrusherRotating Powerful Type PulverizerShip DismantlingExcavator Magnet LiftBox Type Hydraulic BreakerTop Type Hydraulic BreakerSide Type Hydraulic BreakerCar DismantlingExcavator Clamp ArmIntelligent Handling EquipmentHydraulic Steel GrabHydraulic Log GrappleBundle ClampPower ThumbMechanical GrappleSorting GrappleClamshell BucketGrab BucketLotus GrappleBucketSkeleton BucketDredging BucketTilt BucketCompaction & Auxiliary EquipmentHydraulic Plate CompactorCompaction WheelQuick HitchRipper -
Technology
-
Manufacturing
-
News & Media
- Company News
- Industry Insights
-
About Us
- Company Profile
- Corporate Culture
- Chaiman's Message
- Milestones
- Certifications & Awards
-
Contact Us
The slewing ring and its reduction gear are the most expensive wear assembly on an excavator, and the maintenance regime most often applied to them is exactly backwards. Owners grease the ring every day and change the gear oil when they remember.
The correct schedule is the opposite: infrequent, generous greasing of the bearing, and disciplined inspection of the gear cavity.
How the cavity fills with water
Under the boom foot there is an inspection cover. Removing it gives a view into the gear cavity, where the ring gear, the pinion and the grease sit. Between the cavity and the outside world there is a dust seal at the centre joint.
That seal ages. Once it hardens or splits, rain running down the centre joint goes straight into the cavity. The water dilutes the grease, the grease stops carrying load, and the ring gear starts wearing against a film that is no longer lubricating.
The sequence from there is predictable: dilution, accelerated tooth wear, pitting, flaking of the tooth surface, and eventually noise on slew. By the time the operator hears it, the gear is usually past saving.
What to actually do
• Inspect the cavity at 2,000 hours or annually, whichever comes first. Open the cover under the boom foot and the square plate at the front of the undercarriage.
• Grease quantity for a 20-tonne class machine is around 36 litres — roughly two standard drums — at each service. Under-greasing is the common error here, not over-greasing.
• If water is present, drain it from the access plate in the cavity below the ring, then regrease fully. Do not simply add grease on top of water.
• Replace the centre-joint dust seal when it hardens. It is an inexpensive part that prevents an expensive failure.
The bearing itself: less is more
Slewing ring bearings are commonly over-greased because owners apply the same daily routine as the boom and arm pins. The result is the opposite of what is intended.
Excess grease pressurises the bearing cavity, forces the dust seal out, and creates the gap through which contamination enters. Once the seal is displaced, grit reaches the raceway and the bearing fails early — often within a season.
For a standard excavator, one greasing per week is adequate. Machines in wet or dusty conditions may need more frequent inspection, but the answer is inspection, not a heavier schedule.
The commercial case
A slewing ring replacement is one of the largest single repair costs on a 20-tonne machine, and it is almost always the consequence of a seal that cost a fraction of it. The maintenance cost of getting this right is a drum of grease and an hour of labour per service.
Running a fleet and standardising service intervals? We can supply the attachment-side intervals and the wear-part list that pairs with them, so the carrier and the tool are serviced on the same schedule.